Canal Restoration Project Starts in Rock Harbor in Key Largo

KEY LARGO, FL – Monroe County is underway with its water quality improvement and restoration project on canal #84 in Rock Harbor in Key Largo. The work includes organic material removal and backfill of the deeper areas and is funded by a Florida Department of Environmental Protection Keys Stewardship grant. The organic removal process removes the decaying material on the canal’s bottom that continually removes oxygen from the water and causes a strong sulfur (rotten egg) odor. Backfilling is the process of raising the canal bottom to an optimum depth (about 7 feet deep) to allow for maximum flushing and tidal flow in and out of the canal. These restoration techniques will increase the amount of oxygen in the canal, increasing its health and the amount of marine life in it. The project is scheduled to be completed in March 2022. Canal #84 is rated a poor water quality canal.

Already a subscriber? log in.

This story is free for you

Create a free account and get more of KonkLife's top stories directly to your inbox.

Or, subscribe for unlimited access