Alert: Road And Boat Traffic To Be Affected By Installation of Two Concrete Beams For Pedestrian Bridge

KEY LARGO – Traffic on U.S. 1 and boat use through Adams Cut will be affected from 10 p.m. Thursday, July 21 to 5 a.m. Friday, July 22 due to the installation of a 120-foot concrete I beam for the new pedestrian bridge over the Marvin D. Adams Waterway in Key Largo.

Already a subscriber? log in.

This story is free for you

Create a free account and get more of KonkLife's top stories directly to your inbox.

Or, subscribe for unlimited access