Asphalt Emergency Repair Work on North Roosevelt Boulevard

The Florida Department of Transportation (FDOT), through its Contractor, The de Moya Group Inc., will be conducting asphalt repair work at two separate locations along North Roosevelt Boulevard (between 7 Street and Gulfview Drive and just before Eisenhower Drive).

Nighttime eastbound and westbound partial lane closures will occur between 9 p.m. and 6 a.m. on Tuesday, November 15 and Wednesday, November 16 for asphalt operations. There will also be daytime partial lane closures during non-peak hours (9 a.m. to 4 p.m.) on Thursday, November 17.

There will be an off-duty detail officer present to assist in controlling the traffic flow and to ensure that caution is being exercised when approaching these construction areas.

Kindly use additional caution when traversing in this area and adhere to posted speed limit. Please note that this schedule may change due to bad weather or other unexpected conditions.

For more information, please call FDOT Construction Project Manager.

Mark Croft, P.E. at (305) 216-4959.

[livemarket market_name="KONK Life LiveMarket" limit=3 category=“” show_signup=0 show_more=0]