Snake Creek Bridge traffic advisory
Workers for the Florida Department of Transportation will begin temporary, nighttime 15-minute closures of U.S. 1 at the Snake Creek Bridge at Mile Marker 85 from 8 p.m. to 6 a.m. on April 6 to run through April 10.
U.S. 1 will be closed in both directions while new structural components are installed.
This work requires the drawbridge to be opened and closed one or more times. Drivers will be required to wait on either side of the bridge until the bridge reopens. This work is being done as part of the ongoing bridge rehabilitation project.
Note that this schedule may change due to bad weather or other unforeseen conditions.
Drivers are encouraged to call 511 before they travel or log on to www .f1511.com to get real-time traffic and lane closure information.
Please drive cautiously in construction zones.
[livemarket market_name="KONK Life LiveMarket" limit=3 category=“” show_signup=0 show_more=0]
No Comment