ROAD AND DRAINAGE PROJECT ON 1ST STREET AND BERTHA STREET IN KEY WEST TO BEGIN WEEK OF APRIL 19

KEY WEST, FL – Monroe County’s 1st Street and Bertha Street Roadway and Drainage Improvement Project in Key West is scheduled to begin the week of April 19. The work will consist of reconstruction and resurfacing the two roads, installing a new stormwater collection system on Bertha Street, and rehabilitation of the existing stormwater collection system on 1st Street. The County partnered with the City of Key West to include reconstruction of existing sidewalks, construction of additional sidewalk and ADA-compliant curb ramps, and installation of landscape cut-outs. The design calls for reconstructing the roads using an asphalt base instead of typical limerock to minimize deterioration due to high groundwater and future sea-level rise impacts.

Already a subscriber? log in.

This story is free for you

Create a free account and get more of KonkLife's top stories directly to your inbox.

Or, subscribe for unlimited access