Lane Closures at Triangle

The Florida Department of Transportation (FDOT) will begin work at the Triangle on Wednesday, July 5th.

There will be some night time lane closures between 9 p.m. and 6 a.m. The outer lane, outbound will be the first to be closed at night. Later, the outer inbound lane will be affected.

This project will improve the traffic flow for the turn lanes, and includes the installation of a new traffic control cabinet, pedestrian signals, milling and asphalting, concrete modifications on the island and new roadway striping. The work is expected to take up to two months.

[livemarket market_name="KONK Life LiveMarket" limit=3 category=“” show_signup=0 show_more=0]